EPC-357 ROUTING PROCESS (VAPORIZED)
  1. From fluid container to the flow control valve
  2. From valve to "T" intercept into PCV valve line
  3. From "T" through intake manifold into engine combustion chamber
  1. Under the hood of the vehicle, select an area to secure the fluid container. Install with provided hardware.

  2. Mount the needle valve.

  3. Identify the PCV line and select a point to install the "T". Cut and remove 2" of PCV line. Replace with "T" components.

  4. Cut the vapor supply hose to appropriate lengths from the fluid container to the valve and from the valve to the "T".

  5. Place fluid into the container which is canted at an angle not to exceed 30 degrees and firmly secured so that the bubbles are clearly visible.

  6. Start the engine.

  7. Adjust the bubble flow through the fluid to 1/2" diameter (for V8 engines, 3/4").

The initial 32 oz. and all subsequent refills of EPC-357 contained in the POWER PAC will last from 6,000-15,000 miles. Contact us for EPC-357 refills.

© PHOENIX POWER PAC. All rights reserved.
Site development by Jinks Studio.